What holds the house up
Columns, beams and floor slabs cast on your plot in steel reinforced concrete. The walls between them carry nothing but themselves, which is why the rooms can be the shape you want.
BS 4449
Grade B500B bar, delivered with mill certificates and cut to the engineer’s schedule in Litherland.
C32/40
Ready mixed to BS 8500 from a plant with third party certification. Delivery tickets kept for every load.
3 cubes
Taken from each pour and crushed at 7 and 28 days by an independent lab. Results go in your handover file.
Sign off
Building control sees the steel before the concrete goes in. Nothing is covered up that has not been looked at.
| Concrete frame | Timber frame | Brick and block | |
|---|---|---|---|
| Frame up, two storeys | 4 to 6 weeks | 1 to 2 weeks | 8 to 10 weeks |
| Open plan spans | Up to 7 m, no steel | About 5 m | Needs steel beams |
| Sound between floors | Solid slab, best | Needs extra layers | Depends on the floor |
| Fire | Non combustible | Protected by board | Non combustible |
| Cost, shell | Mid | Lowest | Mid to high |
| Mortgage and warranty | Accepted with a warranty | Accepted | Accepted |
Timber frame goes up faster, and we say so. A concrete frame wins on span, sound and how the house feels to live in. Lenders treat it as standard construction once the structural warranty is in place.